UNR Modular Chilled Water Plant – Phase II
Underground utility work is progressing for the second phase of the modular chilled water plant (MCP) at UNR. The main piping connections consist of 20” diameter C900 PVC piping which will connect a new 1400 ton chilled water system into the South Campus Chilled Water loop, which currently feeds over 30 buildings on the UNR campus. This project is a continuation of our phase I project which was constructed late 2015 – early 2016 and included the first module, containing two 225 ton magnetic bearing chillers and completing the underground chilled water loop infrastructure.
Latest News
2022 Poker Tournament
2022 Poker Tournament The 2022 Annual ASHRAE Poker Tournament was a fantastic event. The Texas Hold’em style tournament took place at Taps and Tanks, a Great Basin Brewing facility in Reno, NV where delicious food and beverages were provided. Three tables of about...
Introducing Dave Mason
Introducing Dave Mason We are pleased to introduce Mr. David Mason as our newest Mechanical Engineer. Dave graduated from California Polytechnic, San Louis Obispo with a bachelor’s degree in Engineering Technology. He grew up in Northern California and the Puget Sound...
Sheep Foundation Annual Clay Shoot
Wild Sheep Foundation Annual Clay Shoot – 2022 Ainsworth Associates Mechanical Engineers sponsored a team for this year’s Wild Sheep Foundation Clay Shoot. The event was held at the Capitol City Gun Club in Carson City. The weather was perfect and the team...
Introducing Jacob Roll
Introducing Jacob Roll We are pleased to introduce Jacob Roll as our newest Mechanical Designer. Jacob is currently in his senior year at the University of Nevada, Reno working towards receiving his bachelor’s degree in Mechanical Engineering. Jacob’s education...
2021 Christmas Party
2021 Christmas Party After having to cancel the 2020 Christmas Party due to all things Covid, Ainsworth Associates Mechanical Engineers was thrilled to be able to host it’s 2021 Christmas Party on Friday, December 10th. AAME held the event at the Peppermill Resort and...
O’Brien Middle School Ceremony
O'Brien Middle School Topping Out Ceremony The highest steel beam was raised by CORE Construction at the new O'Brien Middle School building.Latest News
Give Hope Golf Classic 2021
Give Hope Golf Classic 2021 This past week Ainsworth Associates Mechanical Engineers was proud to participate in the 2021 Give Hope Golf Classic. The Give Hope Foundation is a nonprofit organization generously funded by Reno-area sponsors and donors to assist...
Teal Fleur-De-Lis Corn Hole Tournament
Annual Teal Fleur-De-Lis Corn Hole Tournament AAME had a great time competing in and sponsoring the annual Teal Fleur-De-Lis Corn Hole Tournament. Despite a rigorous training regimen, the two AAME teams participating had questionable performances, to say the least....
O’Brien Middle School
O’Brien Middle School Ainsworth Associates Mechanical Engineers recently attended the Groundbreaking Ceremony for our new O’Brien Middle School (OMS) project. This brand new three-story building is being constructed on the existing OMS athletic fields and is slated to...
East Valley Elementary School
East Valley Elementary School Ainsworth Associates Mechanical Engineers is proud to have provided our mechanical and plumbing design expertise to support the 10 classroom addition at East Valley Elementary School in Fernley, Nevada. The new addition included upgrades...