University of Nevada, Reno – Modular Chiller Plant #2

UNR recently took delivery of their second modular chiller plant.  The chiller will connect in to their existing campus chilled water district loop.  This loop serves over 30 buildings on the UNR campus.  This project is a big milestone in UNR’s master plan to consolidate chiller tonnage to a centralized location.  The centralization process reduces the quantity of remote assets and systems to be maintained.  As new chiller tonnage is brought online, existing chillers and their associated systems that are reaching the end of their useful life may be retired from service.  MCP #1 was selected for 550 tons and the plan was to procure a second and third MCP at the same tonnage.  However, due to UNR’s recent growth and new buildings connecting in to the district loop, MCP #2 was selected for 1400 tons.  Under the escort of several Nevada Highway Patrol service members MCP #2 on a 130’ truck/trailer arrived on site August 2nd, 2023 after a 4-day journey from Phoenix, Arizona.

Latest News

Introducing Alex Estrada

Introducing Alex Estrada

Introducing Alex Estrada We are pleased to introduce Alex Estrada as our newest Mechanical Designer. Alex has recently graduated from the University of Nevada, Reno with a Bachelor’s Degree in Mechanical Engineering. Mr. Estrada’s education includes classes in the...

read more
Ainsworth Engineers teamed up

Ainsworth Engineers teamed up

Ainsworth Associates Mechanical Engineers teamed up Ainsworth Associates Mechanical Engineers teamed up with PK Electrical for our first ever CANstruction project! The 17th annual Design/Build Competition was held at Meadowood Mall in early March 2020 and benefits the...

read more
Newest Team Member:  Larry Green

Newest Team Member: Larry Green

Newest Team Member:  Larry Green Ainsworth Associates Mechanical Engineers is pleased to announce the hiring of our newest team member:  Larry Green.  Larry is a licensed PE and brings a long and diverse experience level to the team.  Larry once worked for Peterson...

read more
Great Basin Hall receives LEED Gold Certification

Great Basin Hall receives LEED Gold Certification

Great Basin Hall receives LEED Gold Certification Our most recent residence hall project, Great Basin Hall, which opened at the University of Nevada, Reno in 2018, has recently earned LEED Gold Certification. LEED, which stands for Leadership in Energy and...

read more
Poker

Poker

Poker In November 2019, several of our employees participated in the first annual Northern Nevada ASHRAE poker tournament.  The tournament was organized by the local ASHRAE chapter and was held at Great basin Brewing Company’s Taps and Tanks location. Proceeds...

read more
Roger Gravelle

Roger Gravelle

Roger Gravelle Announcement Ainsworth Associates Mechanical Engineers is proud to announce the promotion of Roger Gravelle from Senior mechanical Designer to a Principal of the firm. Roger has been with Ainsworth Associates Mechanical Engineers since 2008, occupying...

read more
Christmas Announcement

Christmas Announcement

AAME 2019 CHRISTMAS PARTY! On Saturday, December 14th, AAME held its annual employee Christmas party.  This year, the event was hosted at the Peppermill and included dinner, drinks, dancing, and good old fashioned comradery.  We cannot be more thrilled with the...

read more
New Promotion Announcement

New Promotion Announcement

Ainsworth Promotion Announcement Ainsworth Associates Mechanical Engineers is pleased to announce the promotion of two of our Senior Designers to an Associate position!  Dave Carvin and Greg Maestas have combined experience exceeding 78 years.  Over their many years...

read more