UNR Modular Chilled Water Plant – Phase II

Underground utility work is progressing for the second phase of the modular chilled water plant (MCP) at UNR.  The main piping connections consist of 20” diameter C900 PVC piping which will connect a new 1400 ton chilled water system into the South Campus Chilled Water loop, which currently feeds over 30 buildings on the UNR campus.  This project is a continuation of our phase I project which was constructed late 2015 – early 2016 and included the first module, containing two 225 ton magnetic bearing chillers and completing the underground chilled water loop infrastructure.

Latest News

Roger Gravelle

Roger Gravelle

Roger Gravelle Announcement Ainsworth Associates Mechanical Engineers is proud to announce the promotion of Roger Gravelle from Senior mechanical Designer to a Principal of the firm. Roger has been with Ainsworth Associates Mechanical Engineers since 2008, occupying...

read more
Christmas Announcement

Christmas Announcement

AAME 2019 CHRISTMAS PARTY! On Saturday, December 14th, AAME held its annual employee Christmas party.  This year, the event was hosted at the Peppermill and included dinner, drinks, dancing, and good old fashioned comradery.  We cannot be more thrilled with the...

read more
New Promotion Announcement

New Promotion Announcement

Ainsworth Promotion Announcement Ainsworth Associates Mechanical Engineers is pleased to announce the promotion of two of our Senior Designers to an Associate position!  Dave Carvin and Greg Maestas have combined experience exceeding 78 years.  Over their many years...

read more