UNR Modular Chilled Water Plant – Phase II

Underground utility work is progressing for the second phase of the modular chilled water plant (MCP) at UNR.  The main piping connections consist of 20” diameter C900 PVC piping which will connect a new 1400 ton chilled water system into the South Campus Chilled Water loop, which currently feeds over 30 buildings on the UNR campus.  This project is a continuation of our phase I project which was constructed late 2015 – early 2016 and included the first module, containing two 225 ton magnetic bearing chillers and completing the underground chilled water loop infrastructure.

Latest News

ASHRAE Sporting Clays Event

ASHRAE Sporting Clays Event

ASHRAE Sporting Clays Event Ainsworth Associates Mechanical Engineers teamed up with RSAnalysis for the 19th Annual ASHRAE Sporting Clays Event held at the Carson Valley Clays facility in Gardnerville.  While we weren’t the most talented team on the course that day, a...

read more
Introducing Wesley Wilson

Introducing Wesley Wilson

Introducing Wesley Wilson We are pleased to introduce Wesley Wilson as our newest Mechanical Designer. Wesley is currently in his senior year at the University of Nevada, Reno working towards receiving his bachelor’s degree in Mechanical Engineering. Wesley’s...

read more
Introducing Austin Schroeder

Introducing Austin Schroeder

Introducing Austin Schroeder We are pleased to introduce Austin Schroeder as our newest Mechanical Designer. Austin graduated in 2021 from the University of Nevada, Reno with a bachelor’s degree in Mechanical Engineering. Austin’s education includes classes in the...

read more
Intro a Girl to Engineering Day

Intro a Girl to Engineering Day

Introduce a Girl to Engineering Day – 2022 In celebration of National Engineering Week, local non-profit Envirolution partnered with the University of Nevada, Reno to host its first annual Introduce a Girl to Engineering Day.   Forty-two girls participated...

read more
2022 Poker Tournament

2022 Poker Tournament

2022 Poker Tournament The 2022 Annual ASHRAE Poker Tournament was a fantastic event. The Texas Hold’em style tournament took place at Taps and Tanks, a Great Basin Brewing facility in Reno, NV where delicious food and beverages were provided. Three tables of about...

read more
Introducing Dave Mason

Introducing Dave Mason

Introducing Dave Mason We are pleased to introduce Mr. David Mason as our newest Mechanical Engineer. Dave graduated from California Polytechnic, San Louis Obispo with a bachelor’s degree in Engineering Technology. He grew up in Northern California and the Puget Sound...

read more
Sheep Foundation Annual Clay Shoot

Sheep Foundation Annual Clay Shoot

Wild Sheep Foundation Annual Clay Shoot – 2022 Ainsworth Associates Mechanical Engineers sponsored a team for this year’s Wild Sheep Foundation Clay Shoot.  The event was held at the Capitol City Gun Club in Carson City.  The weather was perfect and the team...

read more
Introducing Jacob Roll

Introducing Jacob Roll

Introducing Jacob Roll We are pleased to introduce Jacob Roll as our newest Mechanical Designer. Jacob is currently in his senior year at the University of Nevada, Reno working towards receiving his bachelor’s degree in Mechanical Engineering. Jacob’s education...

read more
2021 Christmas Party

2021 Christmas Party

2021 Christmas Party After having to cancel the 2020 Christmas Party due to all things Covid, Ainsworth Associates Mechanical Engineers was thrilled to be able to host it’s 2021 Christmas Party on Friday, December 10th. AAME held the event at the Peppermill Resort and...

read more
O’Brien Middle School Ceremony

O’Brien Middle School Ceremony

O'Brien Middle School Topping Out Ceremony The highest steel beam was raised by CORE Construction at the new O'Brien Middle School building.Latest News

read more