UNR Argenta Dormitory is Open!
After several years of planning and development, we are thrilled to announce that the building will start receiving students. The residence hall had been closed since July of 2019 and has received several building updates. The reconstruction of the dormitory building included a complete renovation of the boiler room involving high-efficiency modular condensing style boilers, replacing laundry facilities utilizing 100% outdoor air units and exhaust fans, and altering existing HVAC and plumbing systems on the individual floors where needed. A remodel of the existing kitchen was also included as a part of the scope of work. With the campus now fully open after COVID, the extra dormitory rooms along with the newly refurbished Downunder Dining Commons will provide much needed relief to the student housing population.
Latest News
AAME Camping Weekend
AAME Camping Weekend! While the fish weren’t necessarily biting, the team had a wonderful time at our group camping activity over the summer. The weather was perfect and events included slam ball, fishing, swimming, biking, hiking, of course drinking, and most of all...
JWood Raw Elementary School
JWood Raw Elementary School The new J. Wood Raw Elementary School opened this August with just enough time for the 2023-2024 school year. Being one of four AAME designed elementary schools built in the last six years, this 87,000 square foot building provides 28 new...
Annual AIA Golf Tournament
Annual AIA Golf Tournament On a gorgeous late summer day, two of our engineers paired with Clients at the area’s premier golf course - Montreux Golf and Country Club, to sponsor the annual tourney. Local architects, engineers, contractors, materials suppliers, and...
UNR Modular Chiller Plant
University of Nevada, Reno – Modular Chiller Plant #2 UNR recently took delivery of their second modular chiller plant. The chiller will connect in to their existing campus chilled water district loop. This loop serves over 30 buildings on the UNR campus. This...
Chilled Water Plant
Chilled Water Plant Renovation, LCC Without a moment to spare, the new chilled water plant at Lovelock Correctional Center was put into service just in time for the hot July temperatures. AAME is proud to have primed this large mechanical retrofit project that was...
Introducing Zane Minore
Introducing Zane Minore Joining our team as a mechanical intern is Zane Minore. Zane just finished his sophomore year at the University of Nevada, Reno and is expected to graduate with a bachelor’s degree in mechanical engineering with a minor in Math in August of...
Annual Girl Scouts
2nd Annual Girl Scouts of the Sierra Nevada – Triumphant Luncheon In an effort to increase awareness regarding Women in STEM (Science, Technology, Engineering, and Math), AAME was proud to help sponsor the 2023 Girl Scouts Triumphant Luncheon. The Triumphant Luncheon...
AEE Nevada Golf Event
10th Annual 2023 AEE Nevada Golf Event! The Nevada Chapter of the Association of Energy Engineers (AEE) recently held their annual Northern Nevada Golf tournament at Toiyabe Golf Club. Proceeds from this tournament benefit AEE NV scholarships and educational events....
Introducing Max Petrenko
Introducing Max Petrenko Joining our team as a mechanical intern is Max Petrenko. Max just finished his sophomore year at the University of Nevada, Reno and is expected to graduate with a bachelor’s degree in mechanical engineering in December of 2025. Coming from...
Introducing Jack Woodhead
Introducing Jack Woodhead We are pleased to introduce Jack Woodhead as one of our newest mechanical interns. Jack is a sophomore at the University of Utah and plans to graduate with a bachelor’s degree in mechanical engineering. Jack enjoys golfing and spending time...